HISTORY
HISTORY
Leap Forward to a Global Railway Company
2025
Mar.
- Operation and Maintenance of Railway Traffic Control Center Signaling System
- KTX Train Control System (KTCS-1 / ETCS Level 1) for the Suwon Departure Line
- Electronic Interlocking System for the Taebaek Line (Jecheon – Yeongwol Section)
- Electronic Interlocking System at Jecheon Marshalling Yard Station on the Jungang Line
- Electronic Interlocking System for the Seohae Line (Sosa – Wonsi Section)
- Smart Railway Level Crossing Safety System at six Locations including Dannae Crossing on the Gyeongbu Line
2024
Dec.
Oct.
Jul.
Jun.
May
Apr.
Mar.
Feb.
- A Honored with $1-Million Export Tower' for Outstanding Export Performance
- Second Generation Railway Traffic Control System Project
- Establishment of the Integrated Railway Safety Control System — Mongolia Pilot Project
- Supply of CBI/OCC/ATS for Construction of Jakarta LRT 1B (Velodrome-Manggarai) (PT. LRS)
- Manufacturing, Purchasing and Installation of Smart CTC Platform Safety Door System for Seoul Subway (Seoul Metro)
- Refurbishment (Manufacturing, Purchasing and Installation) of Signaling System for Seoul Line 5 (Seoul Metro)
- Manufacturing, Purchasing and Installation of Smart CTC Signaling Equipment for Seoul Subway (Seoul Metro)
- Implementation of Simulator for Controller license and Job Training (Busan Transportation Corporation)
- Train Control System KTCS-1(ETCS-L1) between Janghang line/ Jupo and Pangyo at double line (Korea National Railway)
- The Integrated Wireless Network (LTE-R) for the Urban Railroad Yangsan Line(Nopo-Bukjeong) (Busan Transportation Corporation)
- Electronic Interlocking System for Busan Urban Railway(Jeonpo, Seomyeon) (Busan Transportation Corporation)
- Signaling System for Jinjeop Depot (Seoul Metropolitan Government Urban Infrastructure Headquarters)
- Smart Railroad Crossing for 8 places, including the Dongjwa Railroad Crossing of Gyeongbuk Line (Korea National Railway)
- Train Control System KTCS-M(CBTC) for Sasang-Hadan Line, Busan Urban Railway (Busan Transportation Corporation)
- Grand Award in the Comprehensive Category – Korea Software Company Awards
2023
Sep.
Aug.
Jul.
May
Mar.
Feb.
- Construction Work of Private Investment Project for Great Train eXpress C-Line (GTX-C)
- Refurbishment (manufacturing and purchasing) of Electronic Interlocking Device for Bundang Depot (Korea National Railway)
- Manufacturing and installation of Signaling Equipment for Shinpyeong-Dongdaeshin section, Busan Line 1 (Busan Transportation Corporation)
- Type Test & Manufacturer Approval for Electronic Automatic Block System
- New construction of Gunwi-Yeongcheon Signal Facilities, Dodam-Yeongcheon doubling track railway (Korea National Railway)
- Signaling System of Dobong Depot for Production Purchase and Installation, Dobongsan-Ok Jeong Line (Gyeonggi Province)
- Purchasing and installation of IP-MPLS for Doubling track railway of the Seohae Line and 6 other projects (Korea National Railway)
2022
Dec.
Nov.
Aug.
Jun.
Mar.
- Electronic Interlocking System for Busan Urban Railway (Busan Transportation Corporation)
- Train Control System KTCS-1(ETCS-L1) for Doubling track of Sinansan line
- Tram of Wirye Line (Hanshin Engineering & Construction Group)
- CTC Facilities of Sinansan Line
- CTC Facilities of Metropolitan Rapid Transit Railway A-Line (DL E&C)
- Establishment of Platform Screen Door Monitoring System for 6 stations at Line 2 (Seoul Metro)
- Train Control System KTCS-1(ETCS-L1) for Icheon-Mungyeong railway construction; between Chungju and Mungyeong (Korea National Railway)
- Monitoring System for a Railroad Switch at Busan Urban Railway (Busan Transportation Corporation)
- SIL0 Certificate KTX-CTC (SA) (Ricardo Rail)
- Refurbishment of the Integrated Wireless Network (LTE-R) for Samnangjin-Banseong section of Gyeongjeon Line (Korea National Railway)
2021
Dec.
Oct.
Sep.
Jul.
Jun.
May
Feb.
Jan.
- Manufacturing and purchasing of the Signaling System(OCC) for Byeollae Line (Line 8 extension) (Seoul Metropolitan Government Urban Infrastructure Headquarters)
- Purchasing Signaling System for Doubling track of Ansim-Hayang at Daegu Metro Line 1 (Daegu Metropolitan City Urban Railway Construction Headquarters)
- Operation and Maintenance of the Signaling System at Osong Facility & Equipment Office
- Construction of Signaling System for 2nd section of North-Daejeon Connection line of Gyeongbu High-speed Line (Korea National Railway)
- Connecting Line Interface System (KORAIL)
- Installation of Electronic Interlocking Device of Private Investment Project for Doubling track of Sinansan line Section 7
- Refurbishment of the Integrated Wireless Network for Daejeon Jochajang-Gwangjusongjeong at Honam line (Korea National Railway)
- Operation and Maintenance of the Signaling System for the Airport Railroad
- Refurbishment of Back-up CTC(Centralized Traffic Control) (Korea National Railway)
- Manufacturing and Purchasing of the Local Data Transmission System at line 1,3,4 (Seoul Metro)
- Pilot Implementation of Remote Monitoring System for Seowonju-Hoengseong at Gangneung line (Korea National Railway)
- Total Contract for Electronic Interlocking Device (7 Stations including Iksan Station) (Korea Railroad Corporation)
- Modernization of Railway Signaling System on Nagh Hamady-Luxor, Egypt (Egyptian National Railway)
- Train Control System KTCS-1(ETCS-L1) for Samnangjin-Gupo at Gyeongbu line (Korea National Railway)
- SIL4 Certificate_ZEST-RBC-K3 (TUV SUD)
- Refurbishment of Electronic Interlocking Device for Beomgye-Seoul Grand Park at Gwacheon line (Korea National Railway)
- Refurbishment of Electronic Interlocking Device for Suseo-Ori at Bundang line (Korea National Railway)
2020
Dec.
Nov.
Jul.
Jun.
May
Apr.
Mar.
Feb.
- Electronic Automatic Block System (KORAIL)
- Manufacturing and purchasing of the Signaling System for the additional station at Seoul Metro line 8(Wirye New Town) (Seoul Metro)
- KTCS-M Pilot Project for Section1(Baekseok-Jeongbalsan at Ilsan line) (KORAIL)
- Construction of Onboard Signaling System for Great Train eXpress A-Line
- Refurbishment (manufacturing and purchasing) of old signaling CTC equipment for Line 4 (Seoul Metro)
- Class 2 EMU train simulator (Korea Rail Network Authority)
- Manufacturing and purchasing electronic interlocking system between Hongsung and Station 106 (Korea Rail Network Authority)
- Implementation of Railway Driver's license training equipment for tram (Korean Transportation Safety Authority)
- SIL4 Certificate ZEST KTCS-M (Ricardo Rail)
- KTCS-2 Pilot Project for Jeolla Line (Three Section) (Korea Rail Network Authority)
- SIL4 Certificate ZEST Axle Counter 400 (Ricardo Rail)
- Implementation of signaling equipment for Daegok and Sosa section of Seohae Line
- Construction of signaling and communication system for Seohae Line Section 5
- Manufacturing and purchasing Signaling System (mainline and depot) for Byeollae Line (Line 8 extension) (Seoul Metropolitan Government Urban Infrastructure Headquarters)
2025
Mar.
Operation and Maintenance of Railway Traffic Control Center Signaling System
KTX Train Control System (KTCS-1 / ETCS Level 1) for the Suwon Departure Line
Electronic Interlocking System for the Taebaek Line (Jecheon – Yeongwol Section)
Electronic Interlocking System at Jecheon Marshalling Yard Station on the Jungang Line
Electronic Interlocking System for the Seohae Line (Sosa – Wonsi Section)
Smart Railway Level Crossing Safety System at six Locations including Dannae Crossing on the Gyeongbu Line
2024
Dec.
Oct.
Jul.
Jun.
May
Apr.
Mar.
Feb.
A Honored with $1-Million Export Tower' for Outstanding Export Performance
Second Generation Railway Traffic Control System Project
Establishment of the Integrated Railway Safety Control System — Mongolia Pilot Project
Supply of CBI/OCC/ATS for Construction of Jakarta LRT 1B (Velodrome-Manggarai) (PT. LRS)
Manufacturing, Purchasing and Installation of Smart CTC Platform Safety Door System for Seoul Subway (Seoul Metro)
Refurbishment (Manufacturing, Purchasing and Installation) of Signaling System for Seoul Line 5 (Seoul Metro)
Manufacturing, Purchasing and Installation of Smart CTC Signaling Equipment for Seoul Subway (Seoul Metro)
Implementation of Simulator for Controller license and Job Training (Busan Transportation Corporation)
Train Control System KTCS-1(ETCS-L1) between Janghang line/ Jupo and Pangyo at double line (Korea National Railway)
The Integrated Wireless Network (LTE-R) for the Urban Railroad Yangsan Line (Nopo-Bukjeong) (Busan Transportation Corporation)
Electronic Interlocking System for Busan Urban Railway (Jeonpo, Seomyeon) (Busan Transportation Corporation)
Signaling System for Jinjeop Depot (Seoul Metropolitan Government Urban Infrastructure Headquaters)
Smart Railroad Crossing for 8 places, including the Dongjwa Railroad Crossing of Gyeongbuk Line (Korea National Railway)
Train Control System KTCS-M(CBTC) for Sasang-Hadan Line, Busan Urban Railway (Busan Transportation Corporation)
Grand Award in the Comprehensive Category – Korea Software Company Awards
2023
Sep.
Aug.
Jul.
May
Mar.
Feb.
Construction Work of Private Investment Project for Great Train eXpress C-Line (GTX-C)
Refurbishment (manufacturing and purchasing) of Electronic Interlocking Device for Bundang Depot (Korea National Railway)
Manufacturing and installation of Signaling Equipment for Shinpyeong-Dongdaeshin section, Busan Line 1 (Busan Transportation Corporation)
Type Test & Manufacturer Approval for Electronic Automatic Block System
New construction of Gunwi-Yeongcheon Signal Facilities, Dodam-Yeongcheon doubling track railway (Korea National Railway)
Signal System of Dobong Depot for Production Purchase and Installation, Dobongsan-Ok Jeong Line (Gyeonggi Province)
Purchasing and installation of IP-MPLS for Doubling track railway of the Seohae Line and 6 other projects (Korea National Railway)
2022
Dec.
Nov.
Aug.
Jun.
Mar.
Electronic Interlocking System for Busan Urban Railway (Busan Transportation Corporation)
Train Control System KTCS-1(ETCS-L1) for Doubling track of Sinansan line
Tram of Wirye Line (Hanshin Engineering & Construction Group)
CTC Facilities of Sinansan Line
CTC Facilities of Metropolitan Rapid Transit Railway A-Line (DL E&C)
Establishment of Platform Screen Door Monitoring System for 6 stations at Line 2 (Seoul Metro)
Train Control System KTCS-1(ETCS-L1) for Icheon-Mungyeong railway construction; between Chungju and Mungyeong (Korea National Railway)
Monitoring System for a Railroad Switch at Busan Urban Railway (Busan Transportation Corporation)
SIL0 Certificate KTX-CTC (SA) (Ricardo Rail)
Refurbishment of the Integrated Wireless Network (LTE-R) for Samnangjin-Banseong section of Gyeongjeon Line (Korea National Railway)
2021
Dec.
Oct.
Sep.
Jul.
Jun.
May
Feb.
Jan.
Manufacturing and purchasing of the Signaling System(OCC) for Byeollae Line (Line 8 extension) (Seoul Metropolitan Government Urban Infrastructure Headquarters)
Purchasing Signaling System for Doubling track of Ansim-Hayang at Daegu Metro Line 1 (Daegu Metropolitan City Urban Railway Construction Headquarters)
Operation and Maintenance of the Signaling System at Osong Facility & Equipment Office
Construction of Signaling System for 2nd section of North-Daejeon Connection line of Gyeongbu High-speed Line (Korea National Railway)
Connecting Line Interface System (KORAIL)
Installation of Electronic Interlocking Device of Private Investment Project for Doubling track of Sinansan line Section 7
Refurbishment of the Integrated Wireless Network (LTE-R) for Daejeon Jochajang-Gwangjusongjeong at Honam line (Korea National Railway)
Operation and Maintenance of the Signaling System for the Airport Railroad
Refurbishment of Back-up CTC (Korea National Railway)
Manufacturing and Purchasing of the Local Data Transmission System(LDTS) at line 1,3,4 (Seoul Metro)
Pilot Implementation of Remote Monitoring System (RMS) for Seowonju-Hoengseong at Gangneung line (Korea National Railway)
Total Contract for Electronic Interlocking Device (7 Stations including Iksan Station) (Korea Railroad Corporation)
Modernization of Railway Signaling System on Nagh Hamady-Luxor, Egypt (Egyptian National Railway)
Train Control System KTCS-1(ETCS-L1) for Samnangjin-Gupo at Gyeongbu line (Korea National Railway)
SIL4 Certificate_ZEST-RBC-K3 (TUV SUD)
Refurbishment of Electronic Interlocking Device for Beomgye-Seoul Grand Park at Gwacheon line (Korea National Railway)
Refurbishment of Electronic Interlocking Device for Suseo-Ori at Bundang line (Korea National Railway)
2020
Dec.
Nov.
Jul.
Jun.
May
Apr.
Mar.
Feb.
Electronic Automatic Block System (KORAIL)
Manufacturing and purchasing of the Signaling System for the additional station at Seoul Metro line 8(Wirye New Town) (Seoul Metro)
KTCS-M Pilot Project for Section1(Baekseok-Jeongbalsan at Ilsan line) (KORAIL)
Construction of Onboard Signaling System for Great Train eXpress A-Line
Refurbishment (manufacturing and purchasing) of old signaling CTC equipment for Line 4 (Seoul Metro)
Class 2 EMU train simulator (Korea Rail Network Authority)
Manufacturing and purchasing electronic interlocking system between Hongsung and Station 106 (Korea Rail Network Authority)
Implementation of Railway Driver's license training equipment for tram (Korean Transportation Safety Authority)
SIL4 Certificate ZEST KTCS-M (Ricardo Rail)
KTCS-2 Pilot Project for Jeolla Line (3 sections) (Korea Rail Network Authority)
SIL4 Certificate ZEST Axle Counter 400 (Ricardo Rail)
Implementation of signaling equipment for Daegok and Sosa section of Seohae Line
Construction of signaling and communication system for Seohae Line Section 5
Emerged as a leading Railway Company
2019
Nov.
Sep.
Jul.
May
Mar.
- Lump-sum contract of Laser Radar Obstruction Detecting System (KORAIL)
- Train Control System KTCS-1(ETCS-L1) for Icheon-Mungyeong railway construction; between Icheon and Chungju(Korea Rail Network Authority)
- Refurbishment of catenary's protective equipment for Gyeongbu high-speed railway between Sindong and Busan (Korea Rail Network Authority)
- Train Control System KTCS-1(ETCS-L1) for the Daegu Metropolitan Area Railway
- IMO next-generation marine safety management system for high speed maritime radio communication network construction service (Korea Institute Of Ocean Science & Technology)
- Local Data Transmission System (LDTS) for Korea Railroad Corporation
- Manufacturing and purchasing Automatic Block System for Youngcheon - Singyeongju doubling track railway (Korea Rail Network Authority)
- Philippines Manila MRT-7 E&M System Communication Installation Construction (Hyundai-Rotem)
- Refurbishment , Purchasing and Installation of Train Control System for Kwangmyeang High Speed Railway Phase I (Guangmyung to Dongdaegu)
2018
Dec.
Nov.
Jul.
Jun.
Apr.
Mar.
Jan.
- Purchasing of Signaling CTC equipment for Busan Line 2 (Busan Transportation Corporation)
- Refurbishment Construction of Wire Way for Line 3 (Jichuk to Hongje) (Seoul Metro)
- Train Radio System (LTE-R) for Line 5 (Seoul Metro)
- Signaling System for Shinae Station at Line 6 (Seoul Metro)
- Signaling System for Kwanjgu Metro line 2 (Kwangju Metropolitan Urban Railroad Construction Headquarter)
- SIL4 Certificate ZEST-RBC (Train Control System) (TUV SUD)
- Bujeon-Masan Double-track Railway Private Investment Project Track / System Signaling Construction (Main Line)
- Manufacturing and Purchasing of Signaling System (Depot) for the Hanam Line (Seoul Urban Infrastructure Division, Seoul Metropolitan Government)
- Type Test & Manufacturer Approval for AF Track Circuit (No Transmission Type) (Minister of Land, Infrastructure and Transport)
- Provision of Signaling System for the Jakarta LRT 1 in Indonesia (PT. Wika)
2017
Dec.
Jul.
Apr.
Mar.
Feb.
Jan.
- Type Test & Manufacturer Approval for Electronic Interlocking Device (Minister of Land, Infrastructure and Transport)
- Type Test & Manufacturer Approval for Automatic Block System Controller (Minister of Land, Infrastructure and Transport)
- Purchasing and Installation the Signaling System of Mainline and OCC of the Hanam 5 Line Extension(Seoul Urban Infrastructure Division, Seoul Metropolitan Government)
- SIL4 certification _ Safety Related Automation System "ZEST Interlocking 400" (TUV SUD)
- Provision of Communication System for Philippine Manila MRT 7
- Train Control System KTCS-1(ETCS-L1) for Wonju-Jecheon Double Line
- Signaling and Communication Construction on Zone 1 of Daegok-Sosa Double line
- CTC Control Facility S / W Modification for Wonju-Jecheon Double Track Line (Korea Railway Authority)
- Construction of Test Facility for Traffic Controller License and Certification (Korea Transportation Safety Authority)
- Contract for Implementing Driving Simulator for Type II Electric Vehicle (Woonsong University)
- Supply Contract for Manila MRT 7 Signaling System
- New Construction Works for Conventional Railway Line from Gwangju Songjeong-Gomagwon at 2nd Phase of Honam High Speed Railway
2016
Dec.
Nov.
Jul.
Apr.
Mar.
- Signaling System construction for Railroad Comprehensive Test Line
- Train Control System KTCS-1(ETCS-L1) between Susaek to Sinwon (Korea Railroad Authority)
- Purchasing and Installation of Wavelength Division Multiplexer for Wonju-Gangneung (Korea Railroad Authority)
- Establishment of new platform management system (Seoul Metro)
- Train Control System KTCS-1(ETCS-L1) at Incheon Airport Railway Terminal 2
- Construction of Signaling and Communication System for Bujeon-Masan double track Project (SK E&C)
2015
Dec.
Feb.
- Signaling system for Busan metro Line 1
- Train Radio System (LTE-R) for Busan metro Line 1
- Supply contract for Busan-Masan double track train control facility
2014
Nov.
Sep.
Jul.
Feb.
- Bujeon-Masan Double Track Railway Signal Corporation
- M&A (2014.09.05) _ Vynet co., Ltd.
- Airport Railway Development Contribution Citation(Korail Airport Railway)
- Establishment of Seoul Metro Line 1(Seoul Metro)
- Railway traffic control center system refurbishment (Korea Railroad Authority)
2013
Sep.
Jan.
- Commendation by the Ministry of Land, Transport and Tourism
- CTC of Honam High Speed Railway (Korea Railroad Authority)
2012
May
- Ministry of Knowledge Economy Citation (Ministry of Small and Medium Enterprises)
Shinbundang Extension Line of Gyeongjae-Gwangyoung
2011
Jun.
- SIL4 certification : LEU (TÜV SÜD)
2010
Mar.
- Train Control System KTCS-1(ETCS-L1 )for Kyungchun Line (Korea Railroad Authority)
2009
Feb.
- Train Control System CBTC for Incheon Urban Railway Line 2
2019
Nov.
Sep.
Jul.
May
Mar.
Lump-sum contract of Laser Radar Obstruction Detecting System (KORAIL)
Train Control System KTCS-1(ETCS-L1) for Icheon-Mungyeong railway construction; between Icheon and Chungju(Korea Rail Network Authority)
Refurbishment of catenary's protective equipment for Gyeongbu high-speed railway between Sindong and Busan (Korea Rail Network Authority)
Train Control System KTCS-1(ETCS-L1) for the Daegu Metropolitan Area Railway
IMO next-generation marine safety management system for high speed maritime radio communication network construction service (Korea Institute Of Ocean Science & Technology)
Local Data Transmission System (LDTS) for Korea Railroad Corporation
Manufacturing and purchasing Automatic Block System for Youngcheon-Singyeongju doubling track railway (Korea Rail Network Authority)
Philippines Manila MRT-7 E&M System Communication Installation Construction (Hyundai-Rotem)
Refurbishment , Purchasing and Installation of Train Control System for Kwangmyeang High Speed Railway Phase I (Guangmyung to Dongdaegu)
2018
Dec.
Nov.
Jul.
Jun.
Apr.
Mar.
Jan.
Purchasing of Signaling CTC equipment for Busan Line 2 (Busan Transportation Corporation)
Refurbishment Construction of Wire Way for Line 3 (Jichuk to Hongje) (Seoul Metro)
Bujeon-Masan Double-track Railway Private Investment Project Track / System Signaling Construction (Main Line)
Manufacturing and Purchasing of Signaling System (Depot) for the Hanam Line (Seoul Urban Infrastructure Division, Seoul Metropolitan Government)
Type Test & Manufacturer Approval for AF Track Circuit (No Transmission Type) (Minister of Land, Infrastructure and Transport)
Provision of Signaling System for the Jakarta LRT 1 in Indonesia (PT. Wika)
2017
Dec.
Jul.
Apr.
Mar.
Feb.
Jan.
Type Test & Manufacturer Approval for Electronic Interlocking Device (Minister of Land, Infrastructure and Transport)
Type Test & Manufacturer Approval for Automatic Block System Controller (Minister of Land, Infrastructure and Transport)
Purchasing and Installation the Signaling System of Mainline and OCC of the Hanam 5 Line Extension (Seoul Urban Infrastructure Division, Seoul Metropolitan Government)
SIL4 certification _ Safety Related Automation System "ZEST Interlocking 400" (TUV SUD)
Provision of Communication System for Philippine MRT 7 Project
Train Control System KTCS-1(ETCS-L1) for Wonju-Jecheon Double Line
Signaling and Communication Construction on Zone 1 of Daegok-Sosa Double line
CTC Control Facility S / W Modification for Wonju-Jecheon Double Track Line (Korea Railway Authority)
Construction of Test Facility for Traffic Controller License and Certification (Korea Transportation Safety Authority)
Contract for Implementing Driving Simulator for Two ll Electric Vehicle (Woonsong University)
Supply Contract for Manila MRT 7 Signaling System
New Construction Works for Conventional Railway Line from Gwangju Songjeong-Gomagwon at 2nd Phase of Honam High Speed Railway
2016
Dec.
Nov.
Jul.
Apr.
Mar.
Signaling System construction for Railroad Comprehensive Test Line
Train Control System KTCS-1(ETCS-L1) between Susaek to Sinwon (Korea Railroad Authority)
Purchasing and Installation of Wavelength Division Multiplexer for Wonju-Gangneung (Korea Railroad Authority)
Establishment of new platform management system (Seoul Metro)
Train Control System KTCS-1(ETCS-L1) at Incheon Airport Railway Terminal 2
Construction of Signaling and Communication System for Bujeon-Masan double track project (SK E&C)
2015
Dec.
Feb.
Signaling system for Busan metro Line 1
Train Radio System (LTE-R) for Busan metro Line 1
Supply contract for Busan-Masan double track train control facility
2014
Nov.
Sep.
Jul.
Feb.
Bujeon-Masan Double Track Railway Signal Corporation
M&A (2014.09.05) _ Vynet co., Ltd.
Airport Railway Development Contribution Citation(Korail Airport Railway)
Establishment of Seoul Metro Line 1(Seoul Metro)
Railway traffic control center system refurbishment (Korea Railroad Authority)
2013
Sep.
Jan.
Commendation by the Ministry of Land, Transport and Tourism
CTC of Honam High Speed Railway (Korea Railroad Authority)
2012
May
Ministry of Knowledge Economy Citation (Ministry of Small and Medium Enterprises)
Shinbundang Extension Line of Gyeongjae-Gwangyoung
2011
Jun.
SIL4 certification : LEU (TÜV SÜD)
2010
Mar.
Train Control System KTCS-1(ETCS-L1)for Kyungchun Line (Korea Railroad Authority)
2009
Feb.
Train Control System CBTC for Incheon Urban Railway Line 2
2008
Jul.
- Construction of System Signaling for double railway line between Iksan and Shilla Jeolla Line
2008
Jul.
Construction of System Signaling for double railway line between Iksan and Shilla Jeolla Line
Specialized Railway Signaling and Train Control System Company
2007
Oct.
Sep.
- Changed company name to DAEATI
- Train Control System CBTC for Shinbundang Line
- Train Control System CBTC for Busan-Gimhae Light Rail Transit
2006
Dec.
- Presidential Award of Commendation
- CTC facilities of railroad traffic control Center (KRICT)
2005
Mar.
Jan.
- Awarded by Minister of Finance (Gyeongbu Line High Speed Train)
- Received Prime Minister's Award (Gyeongbu Line High Speed Train)
2004
Jul.
Apr.
Mar.
- Merged and acquired Simmed Co., Ltd.
- Registered as a Comprehensive Electrical Design Services company
- Registered as a Comprehensive Electrical Supervision Services company
- Commendation by the Director of the Korea Railroad (opening of Gyeongbu High Speed Rail
2007
Oct.
Sep.
Changed company name to DAEATI
Train Control System CBTC for Shinbundang
Train Control System CBTC for Busan-Gimhae Light Rail Transit
2006
Dec.
2005
Mar.
Jan.
Awarded by Minister of Finance (Gyeongbu Line High Speed Train)
Received Prime Minister's Award (Gyeongbu Line High Speed Train)
2004
Jul.
Apr.
Mar.
Merged and acquired Simmed Co., Ltd.
Registered as a Comprehensive Electrical Design Services company
Registered as a Comprehensive Electrical Supervision Services company
Commendation by the Director of the Korea Railroad (opening of Gyeongbu High Speed Rail)
2003
Oct.
- Registered indoor construction business
- Registered as general firefighting facility construction work
2002
Dec.
- Contracted for Integrated Railway Traffic Control Center
- Winner of the Venture Company Award
2001
Sep.
Jul.
May
Mar.
- Registered as a specialized electric power control business
- Establishment of Signal Control System Research Center
- Registered KOSDAQ
- Registered electric work
2000
May
- Developed Centralized Traffic Control System (CTC)
1999
May
Apr.
- Purchase of Corporate Office in Bucheon
- Registered as information and communication construction
1995
Sep.
- Established Kyungbong Technology Co., Ltd.
2003
Oct.
Registered indoor construction business
2002
Dec.
Contracted for Integrated Railway Traffic Control Center
2001
Sep.
Jul.
May
Mar.
Registered as a specialized electric power control business
Established Signal Control System Research Center
Registered KOSDAQ
Registered electric work
2000
May
Developed Centralized Traffic Control System (CTC)
1999
May
Apr.
Purchase of Corporate Office in Bucheon
Registered as information and communication construction
1995
Sep.
Established Kyungbong Technology Co., Ltd.